Metro Manila (National Capital Region) is served by three urban rail transit lines and a commuter line. There are four new lines under construction, and five more lines are planned or under consideration. This page lists current, under construction, and proposed mass transit railways of Metro Manila. This also includes every map showing what the […]
philippines
Makati Intra-city Subway
The Makati Intra-city Subway (MkTr) was a proposed underground rapid transit line in Makati, Metro Manila. It was planned to be built under a public-private partnership program between the Makati City Government and a private consortium, led by Philippine Infradev Holdings. The line will have nine stations and 10 km in length. There will be […]
Future Manila – Transport and urban development projects in Metro Manila
Metropolitan Manila (or Metro Manila) is the name used for the greater Manila area. Manila is comprised of 16 cities and 1 municipality that form the National Capital Region (NCR). When referring to Manila it could refer to Manila City (one of the cities of the NCR) or Metro Manila as a whole. Either way, […]
PNR South Long Haul: Rebuilding the PNR South Main Line (Bicol Express) in Luzon
The PNR South Long Haul (PNR Bicol) is a project to reconstruct the railway in Southern Luzon in the Philippines. The line will start at Banlic station in Calamba, Laguna and it will terminate at Daraga, Albay. The line will be 565 km in length with 35 stations, and passenger trains will travel at a […]
Davao Monorail
The Davao People Mover is a proposed monorail line to be built in Davao City, Philippines. The straddle-type monorail line will have 16 stations and 1 depot on a 13 km track. The initial proposal was to build a light rail system, but the Korean firm in charge of the proposal recommended building a monorail […]
Cebu Monorail – A 2-line transit system connecting Mactan Cebu Airport to Cebu City
The Cebu Monorail is a proposed 2-line monorail system in Cebu, Philippines. Cebu was originally studying a proposal to build a light rail transit (LRT) in 2016. The monorail system became the preferred option in 2019 due to the lower cost of construction. The two lines would total 27 km in length, and it would […]
