<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	
	>
<channel>
	<title>
	Comments on: Longest Bridges In Southeast Asia	</title>
	<atom:link href="https://futuresoutheastasia.com/longest-bridges-southeast-asia/feed/" rel="self" type="application/rss+xml" />
	<link>https://futuresoutheastasia.com/longest-bridges-southeast-asia/</link>
	<description>Transport and urban development in Southeast Asia</description>
	<lastBuildDate>Mon, 24 Jun 2024 12:29:01 +0000</lastBuildDate>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	
	<item>
		<title>
		By: James Clark		</title>
		<link>https://futuresoutheastasia.com/longest-bridges-southeast-asia/#comment-96546</link>

		<dc:creator><![CDATA[James Clark]]></dc:creator>
		<pubDate>Fri, 15 Mar 2024 04:44:42 +0000</pubDate>
		<guid isPermaLink="false">https://futuresoutheastasia.com/?p=4616#comment-96546</guid>

					<description><![CDATA[In reply to &lt;a href=&quot;https://futuresoutheastasia.com/longest-bridges-southeast-asia/#comment-96538&quot;&gt;Maynard&lt;/a&gt;.

Thanks for the tip-off-I&#039;ve added it!]]></description>
			<content:encoded><![CDATA[<p>In reply to <a href="https://futuresoutheastasia.com/longest-bridges-southeast-asia/#comment-96538">Maynard</a>.</p>
<p>Thanks for the tip-off-I&#8217;ve added it!</p>
]]></content:encoded>
		
			</item>
		<item>
		<title>
		By: Maynard		</title>
		<link>https://futuresoutheastasia.com/longest-bridges-southeast-asia/#comment-96538</link>

		<dc:creator><![CDATA[Maynard]]></dc:creator>
		<pubDate>Thu, 14 Mar 2024 06:10:28 +0000</pubDate>
		<guid isPermaLink="false">https://futuresoutheastasia.com/?p=4616#comment-96538</guid>

					<description><![CDATA[There’s a cable stayed bridge being built in Sarawak, Borneo called Batang Lupar 1 Bridge estimated span of 4.8km, projected completion 2025 and the longest river crossing in Malaysia. It’s being built close to the rivermouth and currently serviced by a ferry. The bridge will be one of a few bridges built as part of the Sarawak Coastal Road (which technically, when completed will provide a shorter connection between Kuching and Miri) that is being touted as the secondary trans-Sarawak artery.

Cheers!]]></description>
			<content:encoded><![CDATA[<p>There’s a cable stayed bridge being built in Sarawak, Borneo called Batang Lupar 1 Bridge estimated span of 4.8km, projected completion 2025 and the longest river crossing in Malaysia. It’s being built close to the rivermouth and currently serviced by a ferry. The bridge will be one of a few bridges built as part of the Sarawak Coastal Road (which technically, when completed will provide a shorter connection between Kuching and Miri) that is being touted as the secondary trans-Sarawak artery.</p>
<p>Cheers!</p>
]]></content:encoded>
		
			</item>
	</channel>
</rss>

<!--
Performance optimized by W3 Total Cache. Learn more: https://www.boldgrid.com/w3-total-cache/?utm_source=w3tc&utm_medium=footer_comment&utm_campaign=free_plugin

Page Caching using Disk: Enhanced 

Served from: futuresoutheastasia.com @ 2026-11-16 00:21:14 by W3 Total Cache
-->